Completion Instructions
- Fields marked with * are required.
- Highlighted/interactive fields are fillable — use the controls below each label.
- If "Other" is selected, a description box will appear automatically.
- Sections adapt based on your selections (e.g., Load Info appears for Off-Grid systems).
📐 Design defaults (if left blank): Humidity: 10–90% · Altitude: ≤2000 m · No special wind/seismic/salt fog requirements.
1. General Information
Project identification, customer details, supply scope, and site environment.
Please describe your customer type:
Please describe your supply scope requirement:
2. Project Schedule
Key milestone dates for proposal, order, delivery and commercial operation.
3. ESS System Requirements
Application scenarios, energy capacity, power, cycling, and physical specifications.
Describe specific conditions for "Other" function:
4. PCS Information
Power Conversion System supplier, specifications and documentation.
Click to upload or drag & drop
PDF, DWG, PNG, JPG, SVG
5. System Access Information
Grid connection type, voltage, frequency and auxiliary power supply.
Provide auxiliary power supply details:
6. Safety Certification Requirements
Required certifications for battery system, PCS, and the complete BESS.
7. Load Information
Required for Off-Grid systems. Describe connected load characteristics.
Upload load power curve
CSV, Excel, PNG, PDF
8. Other Information & Review
Additional requirements and final review before submission.
Questionnaire Submitted!
Thank you for completing the BigBattery ESS Project Information Form. Our team will review your requirements and get back to you with a customized proposal.